{"id":100390,"date":"2022-12-13T16:58:13","date_gmt":"2022-12-13T19:58:13","guid":{"rendered":"https:\/\/new.ziarulatac.ro\/?p=100390"},"modified":"2022-12-13T17:03:36","modified_gmt":"2022-12-13T20:03:36","slug":"ase-distribuitori-de-energie-electrica-amendati-cu-2-4-milioane-de-lei-de-anre-47133","status":"publish","type":"post","link":"https:\/\/arhiva.ziarulatac.ro\/?p=100390","title":{"rendered":"\u0218ase distribuitori de energie electric\u0103, amenda\u021bi cu 2,4 milioane de lei de ANRE"},"content":{"rendered":"<p><strong>Autoritatea Na\u0163ional\u0103 de Reglementare &icirc;n domeniul Energiei (ANRE) a anun\u021bat mar\u021bi, 13 decembrie, c\u0103 \u0219ase operatori de re\u0163ele de distribu\u0163ie a energiei electrice au fost amenda\u0163i cu o sum\u0103 total\u0103 de 2,4 milioane de lei pentru nerespectarea obliga\u0163iilor legale fa\u0163\u0103 de consumatori.<\/strong><\/p>\n<p>&Icirc;n urma finaliz\u0103rii ac\u0163iunilor de control, fiind constatate nerespect\u0103ri ale obliga\u0163iilor legale, au fost sanc\u0163iona\u0163i contraven\u0163ional cu c&acirc;te 400.000 de lei operatorii Distribu\u0163ie Energie Electric\u0103 Rom&acirc;nia, Distribu\u0163ie Energie Oltenia, Delgaz Grid, E-Distribu\u0163ie Muntenia, E-Distribu\u0163ie Banat \u015fi E-Distribu\u0163ie Dobrogea.<\/p>\n<p>Potrivit ANRE, ca urmare a numeroaselor peti\u0163ii referitoare la racordarea prosumatorilor la re\u0163elele de distribu\u0163ie a energiei electrice, au fost semnate mandate de control la <a href=\"https:\/\/ziare.com\/furnizori-energie-electrica-romania\/amenzi-anre-furnizori-energie-electrica-intrerupere-curent-1770109\" target=\"_blank\">o<\/a>peratorii de distribu\u021bie a energiei electrice pentru a verifica modul &icirc;n care sunt respectate regulile de racordare la un loc de consum existent a instala\u0163iilor de producere a energiei electrice din surse regenerabile.<\/p>\n<p>Aceste reguli au avut ca obiect: respectarea termenului de maximum dou\u0103 zile lucr\u0103toare, de la data &icirc;nregistr\u0103rii notific\u0103rii \u015fi a documenta\u0163iei complete, pentru transmiterea c\u0103tre solicitant a facturii de plat\u0103 a tarifului pentru actualizarea certificatului de racordare; respectarea termenului de maximum cinci zile lucr\u0103toare de la data &icirc;nregistr\u0103rii notific\u0103rii \u015fi a documenta\u0163iei complete, pentru &icirc;nlocuirea sau, dup\u0103 caz, montarea contorului, pentru punerea sub tensiune pentru perioada de probe a instala\u0163iei de producere a energiei electrice; respectarea termenului de maximum trei zile lucr\u0103toare, de la data depunerii de c\u0103tre prosumator procesului-verbal de recep\u0163ie a punerii &icirc;n func\u0163iune, pentru actualizarea\/emiterea \u015fi transmiterea c\u0103tre prosumator a certificatului de racordare; respectarea termenului de maximum dou\u0103 zile lucr\u0103toare, de la data actualiz\u0103rii\/emiterii certificatului de racordare, pentru punerea sub tensiune final\u0103 a instala\u0163iilor electrice aferente locului de consum existent la care s-au racordat instala\u0163ii de producere a energiei electrice din surse regenerabile.<\/p>\n<p><strong>Au fost aplicate amenzi contraven\u021bionale dup\u0103 cum urmeaz\u0103:<\/strong><\/p>\n<ul>\n<li>Distribu\u021bie Energie Electric\u0103 Rom&acirc;nia&nbsp; &nbsp; &nbsp; &nbsp; 400.000 lei<\/li>\n<li>Distribu\u021bie Energie Oltenia&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp; &nbsp;400.000 lei<\/li>\n<li>Delgaz Grid &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 400.000 lei<\/li>\n<li>E-Distribu\u021bie Muntenia &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 400.000 lei<\/li>\n<li>E-Distribu\u021bie Banat &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 400.000 lei<\/li>\n<li>E-Distribu\u021bie Dobrogea &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 400.000 lei<\/li>\n<\/ul>\n<p>ANRE precizeaz\u0103 c\u0103 institu\u021bia va monitoriza &icirc;n continuare respectarea ansamblului de reglement\u0103ri obligatorii instituit de ANRE operatorilor de distribu\u0163ie cu impact direct asupra activit\u0103\u0163ii prosumatorilor.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p><strong>Autoritatea Na\u0163ional\u0103 de Reglementare &icirc;n domeniul Energiei (ANRE) a anun\u021bat mar\u021bi, 13 decembrie, c\u0103 \u0219ase operatori de re\u0163ele de distribu\u0163ie a energiei electrice au fost amenda\u0163i cu o sum\u0103 total\u0103 de 2,4 milioane de lei pentru nerespectarea obliga\u0163iilor legale fa\u0163\u0103 de consumatori.<\/strong><\/p>\n<p>&Icirc;n urma finaliz\u0103rii ac\u0163iunilor de control, fiind constatate nerespect\u0103ri ale obliga\u0163iilor legale, au fost sanc\u0163iona\u0163i contraven\u0163ional cu c&acirc;te 400.000 de lei operatorii Distribu\u0163ie Energie Electric\u0103 Rom&acirc;nia, Distribu\u0163ie Energie Oltenia, Delgaz Grid, E-Distribu\u0163ie Muntenia, E-Distribu\u0163ie Banat \u015fi E-Distribu\u0163ie Dobrogea.<\/p>\n<p>Potrivit ANRE, ca urmare a numeroaselor peti\u0163ii referitoare la racordarea prosumatorilor la re\u0163elele de distribu\u0163ie a energiei electrice, au fost semnate mandate &#8230;<\/p>\n","protected":false},"author":2,"featured_media":100391,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-100390","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eveniment"],"_links":{"self":[{"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=\/wp\/v2\/posts\/100390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100390"}],"version-history":[{"count":0,"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=\/wp\/v2\/posts\/100390\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=\/wp\/v2\/media\/100391"}],"wp:attachment":[{"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100390"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100390"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arhiva.ziarulatac.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}